| Country | Project Name | Executing Agency | Funding Agency | Duration |
| Afghanistan | Conducting Feasibility Study of the Khush Tepa Irrigation Scheme and Power Generation (KTISPG) in Kunduz Balkh and Jawazjan Provinces of Afghanistan for Projects in Support of USAID/AECOM's SWIM Project Activities | AECOM | USAID | 2018-2019 |
| Afghanistan | Water Supply of the City of Kabul - Implementation of Mid-Term Programme-1 (MTP-1) | Afghan Urban Water Supply and Sewerage Cooperation (AUWSSC) | KfW | 2015-2018 |
| Afghanistan | Capacity Building to Ministry of Public Works - Transport Network Development Investment Program, Tranche 1 | Ministry of Public Works, Afghanistan | ADB | 2014-15 |
| Afghanistan | Supervision Consultancy for Construction of Road between Jabul Saraj – Sourbi (50 KM) [Jabul – Nijrab] | ARDS under Ministry of Public Works | ADB | 2010-12 |
| Afghanistan | Detailed Survey and Design of Small and Medium Dams and Related Structures (Sub-consultancy) | ARDS under Ministry of Energy & Water | Govt. of Afghanista | 2010-11 |
| Afghanistan | Ministry of Urban Development Affairs (MUDA) and Afghan Urban Water Supply & Sewerage Corporation (AUWSSC) | Sub-Contractor Agreement for Northern Provinces Afghanistan Urban Water Supply Programme II | Govt. of Afghanistan | 2010-2012 |
| Afghanistan | Dahla Dam Project ("Arghandab Irrigation Rehabilitation Project") in Afghanistan (Sub-consultancy) | Ministry of Energy & Water (MEW), Afghanistan | CIDA | 2009-12 |
| Afghanistan | Golbahar Storage Dam Project, Social Survey, Environmental Assessment and Economic Feasibility Study | Ministry of Energy and Water (MEW), AFG | MEW | 2008-09 |
| Afghanistan | Consultancy Services for Detailed Engineering Design, Procurement Assistance, Project Management and Construction Supervision of Doshi-Pol E Khomri Road , Con-I | The Ministry of Public Works (MPW) | IDB | 2007-09 |
| Afghanistan | Detailed Engineering Design, Procurement Assistance, Project Management and Construction Supervision Consultancy Services of Andkhoy-Aquina Road, Con-II | The Ministry of Public Works (MPW) | IDB | 2007-09 |
| Afghanistan | Feasibility Study of Kelagai Storage Dam Project¿ | Ministry of Energy & Water, Afghanistan | IDA | 2007-08 |
| Afghanistan | Farah Rud Irrigation and Hydropower Project | Ministry of Energy and Water, Afghanistan | Govt. of Afghanistan | 2006-07 |
| Afghanistan | Feasibility Study for Small and Medium | Ministry of Energy & Water, Afghanistan | IDA | 2006-08 |
| Afghanistan | Extension of the Water Supply System of Kabul (Water Supply Kabul-II), Afghanistan | Ministry of Urban Development and Housing (MUDH) of the Government of Afghanistan | KfW-Entwick-lungsbank | 2005-2010 |
| Afghanistan | Re-establishment & Operation of Water Supply and Sanitation Services in Selected Provincial Towns | Afghan Association Coordination Unit (AACA) | International Development Association (IDA) | 2003-2005 |
| Albania | Structural Configuration of Buna Bridge and Cost Comparison Between Early Designed Multispan Bridge and Proposed New Bridge Schemes with Movable Span in Albania | IDB | IDB | 2005-06 |
| Azerbaijan | Accurate Engineering Surveying, Designing, Supervision and Monitoring under the Project “Construction of Social Infrastructure Facilities for IDPs in Azerbaijan” | Social Fund for Development of IDPs (SFDI) | IDB | 2007-2009 |
| Azerbaijan | Accurate Engineering Surveying, Designing, Supervision and Monitoring under the Project ¿Construction of Social Infrastructure Facilities for IDPs in Azerbaijan¿ | Social Fund for Development of IDPs (SFDI) | IDB | 2007-09 |
| Cambodia | A diagnostic assessment of the Cambodian Payment and Settlement System, and the project to upgrade Information Technology in the National Bank of Cambodia (TA 4835-CAM: Preparing the Financial Sector Development Program) | National Bank of Cambodia | ADB | 2007 |
| Canada | Gas Industry Executive Management Program of Canadian Petroleum Training Institute (CPTI) Calgary, Canada | Petrobangla | GOB | 2012 |
| Georgia | Construction Management and Supervision Services for Rehabilitation Works for IDP Housing for Six (6) Former Hospital Buildings and Partial Rehabilitation Works for Twenty two (22) Collective Centers for IDP Durable Housing | Municipal Development Fund (MDF) of Georgia | USAID | 2014 |
| Kazakhstan | CAREC Transport Corridor I (Taraz-Korday Section) Investment Program; CSP-1 Project Management Consultant | Ministry of Transport and Communications | ADB | 2009-13 |
| Nepal | Melamchi Water Supply Project - Design and Construction Supervision Consulting Services during Construction for Headworks and Melamchi Diversion Tunnel | Melamchi Water Supply Board | Government of Nepal | 2015-2017 |
| Pakistan | Feasibility Study of Turkmenistan-Afghanistan-Pakistan Natural Gas Pipeline Project II, ADB TA-6153-REG | Govt. of Pakistan | ADB | 2004 |
| Somaliland | Private Sector Development Reengagement Phase II, Consulting Services Solid Waste Management, Somaliland | World Bank | World Bank | 2012-2013 |
| Sudan | Consultant Services for Design & Supervision of Emergency Water Supply Rehabilitation Works & Construction of Septage Treatment Plant | Institutional Capacity Building for Improvement Access to Water & Sanitation in Port Sudan (ICBIAWS/PS) | AfDB | 2018-2021 |
| Tajikistan | Construction and Equipping Number of Secondary Schools Project (Loan No. 10/695) | Project Implementation Unit (PIU), Ministry of Education and Science, Republic of Tajikistan | SFD | 2018-2021 |
| Tajikistan | TAJ Water Resources Management in Pyanj River Basin-5 Project Implementation and Monitoring Consulting Services for ALRI | Agency for Land Reclamation and Irrigation of the Republic of Tajikistan (ALRI) | ADB | 2017-2021 |
| Tajikistan | Grant 0352-TAJ: Building Climate Resilience in the Pyanj River Basin Implementation Support to State unitary enterprise for housing and communal services (KMK) | State Unitary Enterprise "Khojagii Manzilii Kommunali" | Asian Development Bank (ADB) | 2015-2018 |
| Tajikistan | Kurgan-Tyube Solid Waste - Project Implementation Support, Engineering Design Services and Contract Supervision, Tajikistan | SUE Khojagii Manziliyu Kommunali in Kurgan-Tyube City, Tajikistan | EBRD | 2015-2018 |
| Tajikistan | Technical Support for Development of Feasibility Report for Flood Controlling Measures on Flood Channel Tebalaisai Above the City of Kulyab for its Protection | State Institute Project Management Unit Ferghana Valley Water Resources Management Project, Tajikistan | IDA | 2015-2016 |
| Tajikistan | Additional Financing for Municipal Infrastructure Development Project | AF MIDP | IDA | 2013-2015 |
| Tajikistan | Development of a comprehensive framework for the introduction of River Basin Management to Tajikistan and Support to Local Authorities in the Project Area, Responsible for the Operation and Management of Irrigation and Drainage Schemes | State Institution Project Management Unit Ferghana Valley Water Resources Management Project, Tajikistan | ADB | 2011 |
| Tajikistan | Design and Detail Engineering for the National Testing Centre at Dushanbe | Ministry of Education, Republic of Tajikistan | IDA | 2011-2013 |
| Tajikistan | Dushanbe Solid Waste Management Project | Executive Body of the State Power of the City of Dushabe | European Bank for Reconstruction & Development (EBRD) | 2010 |
| Tajikistan | Preparing Small Scale Hydropower Projects for Private Sector Participation | Open Joint Stock Company Ministry of Industry and Energy of Republic of Tajikistan | EBRD | 2009-10 |
| Tajikistan | Consultancy services on Strengthening Human Capital and Institutional Capacity | Tax Committee The Government of the Republic of Tajikistan | IDA | 2009 |
| Tajikistan | Consultancy Services for Construction and Equipment for School Project, Phase-II | Ministry of Education, General Construction Division, Republic of Tajikistan | SFD | 2009-2012 |
| Tajikistan | Design of Works and Installations for Rehabilitation of Irrigation and Drainage Systems and for Strengthening of Reservoir Embankments under Ferghana Valley Water Resources Management Project | Project Management Unit (PMU), FVWRMP | IDA | 2008-09 |
| Tajikistan | Khatlon Province Flood Risk Management Project [ADB LOAN NO. 40046] | Ministry of Water Resources and Land Reclamation (MWRLR), Tajikistan | ADB | 2008-12 |
| Tajikistan | Ministry of Transport and Communications (MOTC) | Ministry of Transport and Communications (MOTC) | JFPR | 2008-10 |
| Tajikistan | Water Distribution System Leak Detection Program under Municipal, Tajikistan | PMU, Municipal Infrastructure Development Project | World Bank (WB) | 2007-2009 |
| Tajikistan | Detailed Design, Bidding Documents and Supervision of Works under Dushanbe Water Supply Project | Dushanbe Water Supply PMU, Dushanbe, Tajikistan | IDB | 2007-2010 |
| Tajikistan | Preparation of Service Delivery Development Program and Management Improvement Program | PMU, Municipal Infrastructure Development Project | WB | 2007-2009 |
| Tajikistan | Preparation of Service Delivery Development Program and Management Improvement Program | PMU, Municipal Infrastructure Development Project | World Bank | 2007-2009 |
| Tajikistan | Consultancy Services for the ADB Loan No. 2053-TAJ (SF): Education Sector Reform Project | Ministry of Education, Republic of Tajikistan | ADB | 2006 to-Date |
| Tajikistan | Consultancy Services for Management, Design, Monitoring and Supervision of Irrigation Rehabilitation Project | Ministry of Water Resources and Land Reclamation (MWRLR), Tajikistan | ADB | 2006-12 |
| Tajikistan | Construction of Mini Hydro Power Plants in Rural Areas of Tajikistan | Ministry of Energy, Tajikistan | IDB | 2005-07 |
| Tajikistan | Dushanbe-Kyrgyz Border Road Rehabilitation Project (Phase-II) | Ministry of Transport, Republic of Tajikistan | ADB | 2005 |
| Tajikistan | Construction of Mini Hydro Power Plants in Rural Areas of Tajikistan | Ministry of Energy, Tajikistan | IDB | 2005-07 |
| Tajikistan | Training Program on "Micro Credit" for Tajik Participants | PMU, Farm Privatization Support Project, Tajikistan | WB | 2005 |
| Tajikistan | "Assistance in Formulating Courses Based on Banking Services" under Capacity Building Technical Assistance | Foreign Investment and International Financial Institutions Department, National Bank of Tajikistan (NBT) | IDB | 2005-06 |
| Tajikistan | Institutional and Policy Support to the Transport Sector, Tajikistan | Ministry of Transport, Republic of Tajikistan | ADB | 2004 |
| Tajikistan | Consultancy Services for Completion of Construction and Provision of Equipment for Three Secondary Schools in Tajikistan | Ministry of Education, Republic of Tajikistan | SFD | 2004-2006 |
| Tajikistan | Consultancy Services for Completion of Construction and Provision of Equipment for Three Secondary Schools in Tajikistan | Ministry of Education, Republic of Tajikistan | SFD | 2004-06 |
| Tajikistan | Construction Supervision of Dangara Valley Irrigation Project (Phase-1) | Ministry of Water Management & Amelioration, Republic of Tajikistan | IDB | 2002-05 |
| Tajikistan | TA 3601-TAJ Introduction of International Accounting Standards at Barki Tojik | Barki Tojik (Tajik Electricity Board) | ADB | 2001-02 |
| Tajikistan | Reconstruction and Completion of Comprehensive Secondary Schools Project | Ministry of Education, Republic of Tajikistan | IDB | 2000-03 |
| Tajikistan | Reconstruction and Completion of Comprehensive Secondary Schools Project | Ministry of Education, Republic of Tajikistan | IDB | 2000-2003 |
| Tajikistan | Consultancy Services for Developing a Comprehensive Bankable Document, Detailed Engineering Design and Tender Documents for the Dangara Valley Project | Ministry of Water Management & Amelioration, Republic of Tajikistan | IDB | 2000-01 |
| Tanzania | Provision of Construction Supervision Consultancy Services for Urban Infrastructure Development in Mbeya City under The Tanzania Strategic Cities Project (TSCP) | City Director, Mbeya City Council, Mbeya, Tanzania | IDA | 2011-2014 |
| Uzbekistan | Project Preparatory Consultant for the Sustainable Hydropower Project (Sub-consultancy) | ADB | ADB | 2017-2018 |
| Uzbekistan | Construction of Modern Rural Houses (Phase 1) Technical Review of the Constructed Houses and Associated Infrastructures (access and internal roads, access and internal water supply system) in Samarkand, Tashkent and Fergana Regions Istisn’a Agreement (UZB-0075) | “Qishloq Qurilish Invest” LLC | IDB | 2017 |
| Vietnam | Vietnam Dam Rehabilitation and Safety Improvement Project (DRSIP) - Project Implementation Consultant (PIC), Vietnam | DRSIP, Ministry of Agriculture and Rural Development | IDA | 2019-2022 |
| Vietnam | Emergency Rehabilitation of Calamity Damage Project Vietnam | The government of Socialist Republic of Vietnam | Asian Development Bank (ADB) | 2009 |
| Yemen | Consultancy Services for Major Works in Wadi Ahwar under Irrigation Improvement Project | Ministry of Agriculture and Irrigation, Yemen | IDA | 2008 |
| Bangladesh | Consultancy Services for Supervision of Civil Works for the modernization of the TTCs, SD-24 Phase II (Bangladesh & German Technical Training Centre at Dhaka) | SEIP Project, Finance Division, Ministry of Finance | ADB | 2020-2022 |
| Bangladesh | Groundwater Survey for the Data Collection Survey for Water Resource of Southern Chattogram Region, Bangladesh | JICA | JICA | 2020 |
| Bangladesh | Engagement of Architects, Design Engineers and Support Staffs for Designing and Design Review of Station & Buildings Package under Padma Bridge Rail Link Project in Bangladesh | Bangladesh Railway | China EXIM Bank | 2019 |
| Bangladesh | Full time supervision, design review & as-build drawing preparation etc. for Improvement of damaged Roads, Drainage, Footpath and Road Safety of Different Zones under DNCC | Dhaka North City Corporation (DNCC) | GOB | 2019-2021 |
| Bangladesh | Widening of approach road and development of other essential infrastructure of Bangabandhu Sheikh Mujib Safari Park, Gazipur, Bangladesh | Bangladesh Forest Department (BFD) | GOB | 2019-2021 |
| Bangladesh | Transaction Advisory Services for Design and Supervision of works at Mirsarai EZ, Bangabandhu Sheikh Mujib Shilpanagar under Bangladesh Economic Zones Development Project (Phase-1) | Bangladesh Economic Zines Authority (BEZA) | GOB | 2019-2021 |
| Bangladesh | Grant-0584 BAN: Power System Efficiency Improvement (Off-Grid Solar Photovoltaic Pumping Systems Component) - Consulting Services for Gender Action Plan Implementation Services (37113-014) in Bangladesh | Bangladesh Rural Electrification Board (BREB) | ADB | 2019-2021 |
| Bangladesh | Engineering Design and Construction Supervision of Project for Establishment of Sewerage System in Chattogram Metropolitan (Phase-1) | CWASA | GOB | 2019-2013 |
| Bangladesh | Feasibility Study of Ramgarh as Well as Detail Design of Ramgarh, Bhomra and Benapole Land Ports project (Package No.: BLPA/S-3, IDA Credit No. 6002-BD) | Bangladesh Land Port Authority (BLPA) | IDA | 2019-2020 |
| Bangladesh | Replacement of Existing Distribution System by Underground Distribution Network System, DPDC | DPDC | GOB | 2019-2020 |
| Bangladesh | TA-9408 BAN: Updating the Road Master Plan | ADB | ADB | 2019-2021 |
| Bangladesh | Design, development & installation of multi-platform GIS based application for the management of distribution network of DESCO for technical, financial and managerial benefits | DESCO | GOB | 2019-2024 |
| Bangladesh | Char Development and Settlement Project Bridging (CDSP-B) | BWDB through GoN | GoN, IFAD | 2019-2022 |
| Bangladesh | Design and Supervision of Water Supply Systems & Environmental Management (Drainage, Faecal Sludge and Solid Waste Management) in 32 Pourashavas, Dhaka | DPHE | GOB | 2019-2021 |
| Bangladesh | Geotechnical Site Investigation Management.of Carrying Out Feasibility Study and Preliminary Design for Construction of Dhaka Subway, Bangladesh | Bangladesh Bridge Authority (BBA) | GOB | 2019-2020 |
| Bangladesh | Detail Designs (DD) of Subprojects under the Sustainable Small Scale Water Resources Development Project (SSSWRDP) (Package No: PD/SSSWRDP/SD-18/2018) | LGED | GoB | 2019-2021 |
| Bangladesh | Preparation of Tourism Master Plan of Bangladesh | Bangladesh Tourism Board | GOB | 2019-2021 |
| Bangladesh | Installation of Surface Water Treatment Plant of Mongla Port Authority | Mongla Port Authority | GOB | 2019-2020 |
| Bangladesh | Feasibility Study and Preliminary Design for Construction of Dhaka Subway, Bangladesh - Transportation Surveys Management | Bangladesh Bridge Authority (BBA) | GOB | 2019 |
| Bangladesh | Consultancy Services for Carrying Out Household Survey (with B-D) under Feasibility Study and Preliminary Design for Construction of Dhaka Subway Project | Bangladesh Bridge Authority (BBA) | GOB | 2018-2019 |
| Bangladesh | Mid-Term Outcome Survey including Result and Impact Management System (RIMS) Study under Coastal Climate Resilient Infrastructure Project (CCRIP) | LGED | IFAD | 2018 |
| Bangladesh | Consultancy Services for Preparation of a Master Plan for the Rural Electrification (RE) Program in Bangladesh for BREB | Bangladesh Rural Electrification Board (BREB) | IDA | 2018-2019 |
| Bangladesh | Consultancy Services for Carrying Out Feasibility Study and Preliminary Design for Construction of Dhaka Subway | Bangladesh Bridge Authority (BBA) | GOB | 2018-2020 |
| Bangladesh | Project Implementation Consultancy Services for SASEC Road Connectivity Project II: Improvement of Elenga-Hatikamrul-Rangpur Road to a 4-Lane Highway | RHD | ADB | 2018-2022 |
| Bangladesh | Preparation of Design & Estimation of Sewerage & Storm Water Network of Jahurul Islam City (Aftabnagar) | Eastern Housing Limited | Eastern Housing Limited | 2018 |
| Bangladesh | Business Case and Transaction Implementation for the Centralized Effluent Treatment Plant (CETP) for the Mirsarai-2A Economic Zone | Bangladesh Economic Zones Authority (BEZA) | World Bank | 2018-2019 |
| Bangladesh | Feasibility Study and Detail Design for Construction of Dhaka-Chittagong via Comilla/Laksam High Speed Railway | Bangladesh Railway | China EXIM Bank | 2018-2019 |
| Bangladesh | Environmental Impact Assessment (EIA) study of Small Scale LNG Floating Storage and Re-gasification Unit (FSRU) moored at KAFCO/CUEL Jetty on the bank of Karnaphuli River in Chittagong. | Karnaphuli Gas Distribution Company Limited (KGDCL) | GoB | 2018 |
| Bangladesh | Environmental Impact Assessment (EIA) (ROAD) under JICA Preparatory Survey for the Matarbari Port Development in Bangladesh | JICA Survey Team (PADECO Co. Ltd.) | JICA | 2018 |
| Bangladesh | Resettlement Action Plan (RAP) (ROAD) under JICA Preparatory Survey for the Matarbari Port Development in Bangladesh | JICA Survey Team (PADECO Co. Ltd.) | JICA | 2018 |
| Bangladesh | Small Scale Water Resources Development Project (Phase-2) | LGED | JICA | 2018-2023 |
| Bangladesh | Strategic Environmental Assessment (SEA) under JICA Data Collection Survey on the Matarbari Port Development in Bangladesh | JICA Project Team | JICA | 2017 |
| Bangladesh | GIS (Geographical Information System) Based Distribution Network System and Preparation of a 20 Years Master Plan for DPDC | Dhaka Power Distribution Company Limited (DPDC) | GoB | 2017-2018 |
| Bangladesh | Feasibility Study and Design for Improvement for Improved Latrine in Extremely Hard to Reach Areas under National Sanitation Project (Phase-III) | DPHE | GOB | 2017-2018 |
| Bangladesh | GIS Based Property and Infrastructure Asset Management Systems (GIS-PIAMS) Consultancy Services under MGSP (S-06) | LGED | IDA | 2017-2018 |
| Bangladesh | Final Technical Inspection of Financial Cooperation Projects - Field Visits to SRIIP, RIIP and CRDP projects | KfW | KfW | 2017 |
| Bangladesh | Consultancy Services for Reviewing of the Design, Construction Supervision of EPC/Turnkey Contract & Contract Management for 500 MLD Capacity of Dasherkandi Sewage Treatment Plant Project | Dhaka WASA | China EXIM Bank | 2017-2020 |
| Bangladesh | Consultancy Services for Operational Audit Under Municipal Governance and Services Project (MGSP) | LGED | IDA | 2017 |
| Bangladesh | City Region Economic Development Investment Program (City Region Development Project - II), CRDP - II for Preparation, Design and Supervision (PDS) Consultancy Services | LGED | ADB | 2017-2020 |
| Bangladesh | Environmental Impact Assessment (EIA) of Offshore LNG Floating Storage and Re-gasification Unit (FSRU) moored at STL (Submerged Turret Loading) Project, Maheshkhali, Cox’s Bazar | GTCL | GoB | 2017 |
| Bangladesh | Management Design and Supervision (MDS) Consultancy Services (Package No. UGIIP-III-AF/MDS/02) | LGED | ADB | 2017-2021 |
| Bangladesh | Environmental Impact Assessment (EIA) under JICA Preparatory Survey for the Matarbari Port Development in Bangladesh | JICA Survey Team (PADECO Co. Ltd.) | JICA | 2017-2018 |
| Bangladesh | Resettlement Action Plan (RAP) under JICA Preparatory Survey for the Matarbari Port Development in Bangladesh | JICA Survey Team (PADECO Co. Ltd.) | JICA | 2017-2018 |
| Bangladesh | Pre-Feasibility Study of Bogra and Natore Economic Zone | BEZA | GOB | 2017-2018 |
| Bangladesh | Gas Market Assessment - Bangladesh | ICF Consulting India Private Ltd. | ICF | 2017 |
| Bangladesh | TA-9160 BAN: Preparing Information Technology Parks for Employment and Innovation | ADB | ADB | 2017 |
| Bangladesh | TA-8556 REG: Supporting the Cities Development Initiative for Asia - BAN: PFS and Preliminary Engineering in Gazipur and Khulna for Consultancy Services | ADB | ADB | 2017 |
| Bangladesh | Detailed Feasibility Study for Construction of Common Utility Tunnel in the Primary Roads of Dhaka South City Corporation Area (App. 6 Km) | Dhaka South City Corporation | Dhaka South City Corporation | 2016 |
| Bangladesh | Scoping Environmental and Social Aspects: Liquefied Natural Gas Floating Storage and Regasification Unit and import terminal infrastructure, Moheshkhali Island, Bangladesh | Acorn International | IDA | 2016 |
| Bangladesh | ICT Roadmap for the Power Sector in Bangladesh | Power Cell | IDA | 2016-2017 |
| Bangladesh | TA-7872 BAN: Khulna Water Supply Project (42171-013) | Khulna Water Supply and Sewerage Authority (KWASA) | ADB | 2016 |
| Bangladesh | Consulting Services for Impact Assessment of Integrated Agricultural Productivity Project (IAPP) | IAPP, Ministry of Agriculture | GoB | 2016 |
| Bangladesh | Resource Mapping of Selecting Beels through PRA and Professional Documentation, Mapping and Printing under Beel Development Activities of HFMLIP (RM 01 – RM 04) | LGED | JICA | 2016 |
| Bangladesh | Survey, Design and Documentation for School cum Cyclone Shelter - Z3-669 as replacement of site Z2-407 under Package 13 and Scout Training Centre cum Cyclone Shelter under Fael Khair Program | IMC Worldwide Ltd. | IDB | 2016 |
| Bangladesh | The Inventory Survey of Hydraulic Structures of Water Resources Development Schemes in Cox's bazar O & M Division BWDB | BWDB | JICA | 2016 |
| Bangladesh | Conducting Evaluation Study on the Completed Project titled "Secondary Towns Integrated Flood Protection (Phase-2)" Project - BWDB part | IMED, MoP | GoB | 2016 |
| Bangladesh | Conducting Environmental and Social Impact Assessment (ESIA) of Kaliakoir High Tech Park | Bangladesh Technosity Limited (BTL) | BTL | 2016 |
| Bangladesh | Irrigation Management Improvement Project (IMIP) for Muhuri Irrigation Project (MIP), ADB Loan No. 3135-BAN (SF) | BWDB | ADB | 2016-2021 |
| Bangladesh | Support to Capacity Building of Bangladesh Economic Zones Authority (under Private Sector Development Support Project | Bangladesh Economic Zones Authority (BEZA) | World Bank | 2016 |
| Bangladesh | Irrigation Management Operator (IMO) for Muhuri Irrigation Project (MIP) | BWDB | ADB | 2016-2021 |
| Bangladesh | Governance Improvement and Capacity Development (GICD) Consulting Services under Northern Bangladesh Integrated Development Project (NOBIDEP) | LGED | JICA | 2015-2019 |
| Bangladesh | Consultants Services for Third Party Monitoring & Evaluation of Overall Project Implementation under Coastal Embankment Improvement Project, Phase-1 (IDA Credit #5280-BD) | BWDB | IDA | 2015-2021 |
| Bangladesh | Consultancy Services for Management, Design & Supervision and Other Related Services for Haor Flood Management and Livelihood Improvement Project | BWDB | JICA | 2015-2022 |
| Bangladesh | Consultancy Services for Screening and Feasibility Study of Route Options Connecting Chittagong, Bangladesh and NE Border Area, and Survey, Detail Design of Road Connecting Thegamukh and Highway to Chittagong under Bangladesh Trade and Transport Studies RETF Project (BTTSRP), Contract Package No. MOS-S4 | LGED | GoB | 2015 |
| Bangladesh | Technical Evaluation of GIZ Office Premises | Grontmij GmbH | GIZ - German Development Coorporation | 2015 |
| Bangladesh | Technical Assistance and Supervision of 40 Pourashavas and Growth Centre Water Supply & Environmental Sanitation Project (Phase-II) | DPHE | GoB | 2015-2017 |
| Bangladesh | Engineering Services Relating to Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazilla in Dhaka, Bangladesh | Hyundai Rotem | Hyundai Rotem | 2015 |
| Bangladesh | ADB TA 7820 BAN: Khulna Sewerage Master Plan2015-2016 | ADB | ADB | 2015-2016 |
| Bangladesh | Design, Supervision & Monitoring Consultancy for Field Infrastructure under Climate Resilient Participatory Afforestation and Reforestation Project | Bangladesh Forest Department (BFD) | World Bank | 2015-2017 |
| Bangladesh | Primary Compaction Test of Embankment Material in Khaliajuri | JICA | JICA | 2015 |
| Bangladesh | a) Regulatory Review for Liquefied Natural Gas Floating Storage and Regasification Unit and import terminal infrastructure, Moheshkhali Island, Bangladesh b) Stakeholder Engagement and Supporting Services for Moheshkhali Floating LNG, Bangladesh | Acorn International | Acorn International | 2015 |
| Bangladesh | Development of Web Based GIS Application System for Land Use Map of Chittagong Metropolitan Master Plan Area | Chittagong Development Authority (CDA) | GoB | 2015-2016 |
| Bangladesh | ADB TA-8839 BAN: Study on Energy Security | BPDB | ADB | 2015-2016 |
| Bangladesh | Consulting Services for the Management and Supervision of the Implementation of Dhanua – Elenga and West Bank of Bangabandhu Bridge – Nalka Gas Transmission Pipeline Project | GTCL | JICA | 2015-2018 |
| Bangladesh | The Inventory Survey of Hydraulic Structures of Water Resources Development along the Manu River in Moulvibazar | JICA/BWDB | JICA | 2015 |
| Bangladesh | Preparation of Action Area Plan for Gazipur City Corporation under Preparation of Action Area Plan for Narayangonj and Gazipur City Corporation | LGED | GoB | 2015-2017 |
| Bangladesh | Design, Construction Supervision and Related Services under Karnaphuli Water Supply Project-Phase-2 (KWSP2) | Chittagong WASA | JICA | 2014-2021 |
| Bangladesh | Rehabilitation and Expansion of Existing Supervisory Control and Data Acquisition (SCADA) System of National Gas Grid under GTCL (Component B of Bheramara Combined Cycle Power Plant Development Project) | GTCL | JICA | 2014-2017 |
| Bangladesh | Geotechnical Investigation and Topographic Survey for Detailed Embankment Design of Pilot Project | JICA | The JICA Expert Team (IDEA Consultants) | 2014 |
| Bangladesh | Integrated Performance Audit Consultant (IPAC) of Second Rural Transport Improvement Project (RTIP-II) | LGED | WB | 2014-2018 |
| Bangladesh | Consulting Services for Engagement of Environment Monitoring Consultant for Investment Promotion and Financing Facility (IPFF) Project under Package # S19 (A1) | IPFF Project Cell, Bangladesh Bank | World Bank | 2014-2015 |
| Bangladesh | Consulting Services for Execution Survey of Natural Condition for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project | TEPSCO | JICA | 2014-2015 |
| Bangladesh | Development of Food Grain Movement Manual, Least Cost Route, Stock in Transit, Movement Programming Software and Reviewing of Godown and Transit Loss | Directorate General of Food, Ministry of Food | GOB | 2014-15 |
| Bangladesh | Padma (Jashaldia) Water Treatment Plant (Phase-1) Project (PJWTPP) | Dhaka WASA | China EXIM Bank | 2014-2019 |
| Bangladesh | Drillstem Testing and Production Testing Services with equipment for Drilling of 1 appraisal cum development oil/gas well (KTL-7) at Kailashtilla structure of SGFL | SGFL | GoB | 2014-2015 |
| Bangladesh | Consulting Services for Conducting Baseline Survey under Northern Areas Reduction of Poverty Initiative (NARI) Project (Contract Package # MOLE-S11) | Ministry of Labor and Employment (MOLE) | World Bank | 2014-2016 |
| Bangladesh | Feasibility Study and Detail Design of PSSWRSP | BWDB | ADB | 2014-2015 |
| Bangladesh | Site Supervision Services for The Fael Khair School-Cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR (Supervision of Construction Packages 11 & 12) | IMC Worldwide Ltd. | IDB | 2014-2016 |
| Bangladesh | Geotechnical Investigation and Cross-Section Survey for Stability Assessment of Damaged Embankment | The JICA Expert Team (IDEA Consultants) | JICA | 2014 |
| Bangladesh | Construction Supervision for DNCC Warehouse under the Programme for Improvement of Solid Waste Management in Dhaka City Toward Low Carbon Society in the People's Republic of Bangladesh | Yachiyo Engineering Co., Ltd (YEC), Japan | JICA | 2013-2014 |
| Bangladesh | Innovations for More Food with Less Water-Task 2: Country and Project-Specific Recommendations and Pilot Initiatives (4572-001) (Sub-consultancy Agreement with Lahmeyer International) | BWDB | ADB | 2013-2014 |
| Bangladesh | BRAC WASH Low Cost Sanitation | WASTE | IRC | 2013-2014 |
| Bangladesh | Field Survey, Investigation and Feasibility Study (FISIS) of 5 (five) Nos. Rubber Dam | LGED | GoB | 2013-2014 |
| Bangladesh | Preparation of Master Plan for Kishoreganj Paurashava under District Towns Infrastructure Development Project | LGED | GOB | 2013-2014 |
| Bangladesh | Design, Estimate and Supervision of Construction for the Bangabandhu Sheikh Mujib Safari Park, Gazipur, Bangladesh | Conservator of Forests, Wildlife and Nature Conservation Circle | GOB | 2013-2014 |
| Bangladesh | Design, Management and Supervision of the Enhancing Quality Seed Supply Project | Ministry of Agriculture (MoA) through BADC | IDB | 2013-2016 |
| Bangladesh | Installation of Surface Water Treatment Plant at CPA Premises | Chittagong Port Authority (CPA) | GOB | 2013-2014 |
| Bangladesh | Road Safety Improvement Programs (TA 7840-BAN) | Ministry of Communication | ADB | 2013 |
| Bangladesh | Consulting Services for Planning and Design on Access Road for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh (JICA Study) | Tokyo Electric Power Services Co. Ltd (TEPSCO) | JICA | 2013 |
| Bangladesh | Coordinating Services for Planning and Design on Access Road for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh (JICA Study) | TEPSCO | JICA | 2013 |
| Bangladesh | Information Research on Water Resources for Low Water Control in Bangladesh | JICA Expert | JICA Expert | 2013 |
| Bangladesh | Integrated Planning for Sustainable Water Management (IPSWAM) - Blue Gold Program | BWDB and DAE | Embassy of the Kingdom of the Netherlands | 2013-2019 |
| Bangladesh | JICA Project for Capacity Development of Management for Sustainable Water Related Infrastructure in The People's Republic of Bangladesh | The JICA Expert Team | JICA | 2013-2016 |
| Bangladesh | Preparatory Survey on Upper Meghna River Basin Watershed Management Improvement Project | JICA Expert | JICA Expert | 2013 |
| Bangladesh | TA 39295-032 BAN: Preparing Urban Governance and Infrastructure Improvement (UGIIP3) | LGED | ADB | 2013-2015 |
| Bangladesh | Environmental Impact Assessment (EIA) for HILIP Project Areas Compaising 28 Haor Upzilas of 5 Districts | HILIP, LGED | GoB | 2013-2014 |
| Bangladesh | JICA Data Collection Survey on Water Resources Management in Haor Area of Bangladesh | The JICA Study Team | JICA | 2013 |
| Bangladesh | Feasibility Study, Design and Construction Supervision of Modunaghat Water Treatment Plant and related Transmission Pumping Facilities | Chittagong WASA | IDA | 2013-2016 |
| Bangladesh | TA-8074 REG: Applying Remote Sensing Technology in River Basin Management (44164-012) | ADB | ADB | 2012-2014 |
| Bangladesh | Environmental Management Plan (EMP) Study for 10 (Ten) Existing Plans of Sylhet Gas Fields Limited | Sylhet Gas Fields Ltd. | GoB | 2012 |
| Bangladesh | Environmental Impact Assessment (EIA) in favour of Offshore LNG Floating Storage and Regasification Unit (FSRU) Terminal permanently moored at Island / Finger Jetty Activities Project at Maheshkhali area under Cox's Bazar District | GTCL | GOB | 2012-2013 |
| Bangladesh | Provision of LQ Water Sampling & Microbiological Analysis Services. | TULLOW Bangladesh Ltd. | TULLOW | 2012-2013 |
| Bangladesh | Provision of EQS Sampling & Analysis Services | TULLOW Bangladesh Ltd. | TULLOW | 2012 |
| Bangladesh | Provision of Black & Grey Water Sample Analysis Services | TULLOW Bangladesh Ltd. | TULLOW | 2012 |
| Bangladesh | Provision of Radiation Monitoring Services | TULLOW Bangladesh Ltd. | TULLOW | 2012 |
| Bangladesh | The Preparatory Survey on Chittagong Water Supply Improvement Project (Ground Level Survey & Social Survey) | NJS Consultants Co. Ltd. | NJS | 2012 |
| Bangladesh | Technical Assistance and Supervision of the IDB Assisted Water Supply and Sanitation Project in Cyclone Prone Coastal Areas of Bangladesh (Project No. BD-157) | DPHE | IDB | 2012-2015 |
| Bangladesh | Consultancy Services for 37 District Towns Water Supply Project | DPHE | GoB | 2012-2014 |
| Bangladesh | Data Collection Survey on Water Supply Sector in Local Municipalities in Bangladesh | World Bank | World Bank Group | 2012 |
| Bangladesh | Data Collection Survey on Water Supply Sector in Local Municipalities in Bangladesh | Tokyo Engineering Consultants (TEC) Co. Ltd. | JICA | 2012 |
| Bangladesh | Design and Supervision Consultancy Services for Khulna Water Supply Project (ADB Component) | Khulna Water Supply and Sewerage Authority (KWASA) | ADB | 2012-2017 |
| Bangladesh | Digital Information System Project | Bangladesh Bureau of Statistics (BBS) | GOB | 2012-2013 |
| Bangladesh | TA-7604 BAN:Supporting Governance Management Project for Directorate of Land Records and Surveys (DLRS) | ADB | ADB | 2012-2014 |
| Bangladesh | Consultancy services for drilling & completion of wells and installation of gas processing plants to assist the Company in implementing the above project | BGFCL | GoB | 2012-2013 |
| Bangladesh | Conduct Integrated Environmental Impact Assessment (EIA) Study for (a) 5000 BPD capacity Condensate Fractionation Plant (CFP) with Catalytic Reforming Unit (CRU) and (b) 1500 BPD capacity Catalytic Reforming Unit (CRU) at Rashidpur to convert Petrol into Octane at Kamaichera, near Railway Station at Upazilla-Bahubol, District-Hobigonj | Sylhet Gas Fields Ltd. | SGFL | 2012 |
| Bangladesh | Detail Design and Construction Supervision for Development of Water Supply System in Khulna City | Khulna WASA | GOB | 2011-2012 |
| Bangladesh | Environmental Impact Assessment of Sundalpur Gas/Oil Exploration. | BAPEX | GoB | 2011 |
| Bangladesh | Consulting firm to undertake Mid Term Evaluation of AEC | Department of Agriculture Extension (DAE) | DANIDA | 2011 |
| Bangladesh | Feasibility Study of Capital Dredging and Sustainable River Management in Bangladesh. | BWDB | GoB | 2011-2013 |
| Bangladesh | Onshore Surveys (FEED & PMC for Installation of a SPM and Pipeline System) | Eastern Refinery Ltd. | IDB | 2011-Ongoing |
| Bangladesh | Environmental Impact Assessment (EIA) study along the selected route of the proposed Gas transmission pipeline from Jalalabad to Danua via Bibiyana | GTCL | GoB | 2011-2012 |
| Bangladesh | Dhaka bus network and regulatory reform implementation study and design work | Dhaka Transport Coordination Board (DTCB) | World Bank | 2011-2013 |
| Bangladesh | Development of the BRT and Corridor Restructuring Implementation Study and Preliminary Design work for the Uttara - Mohakhali - Ramna - Sadarghat Corridor in Dhaka. | Dhaka Transport Coordination Board (DTCB) | IDA | 2011-2013 |
| Bangladesh | Feasibility Study (a) for construction of Bridge at ferry location at 70th km on Labukhali-Dumki-Bogra-Dashmina-Golachipa-Amragachi Road (Z8806) (b) for Construction of Bridge At ferry location at 53rd km on Barishal - Jhalokathi - Bhandaria-Pirojpur Road (R-870) over the river Kocha & (c) for construction of Bridge at ferry location at 8th km on Rahmatpur-Babuganj-Muladi-Hizlakok Road (Z8034) | Bangladesh Bridge Authority, Setu Bhaban, Dhaka | GoB | 2011-2012 |
| Bangladesh | Site Supervision Services for Fael Khair School-Cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR | IDB | IDB | 2011-2014 |
| Bangladesh | Sustainable Urban Primary Health SDP II | Asian Development Bank | ADB | 2011-2012 |
| Bangladesh | Agency Agreement with CPTI International Inc. | CPTI | CPTI | 2011-2013 |
| Bangladesh | Monitoring & Evaluation-Base Line Survey, Mid-term Evaluation & End of Project Evaluation (S-9), Avian Influenza Preparedness and Response Project | Dept. of Livestock Services | GoB/WB/IDA | 2011-2012 |
| Bangladesh | Offshore & Onshore EIA Studies for Installation of A Single Point Mooring & Pipeline System) | Eastern Refinery Ltd. | IDA & GOB | 2011-2012 |
| Bangladesh | Data Collection under the Project "Support to JICA Study Team for Water Resources Development Poject in Meghna Basin" (Sub-Consultancy) | JICA Study Team | JICA | 2011 |
| Bangladesh | Agro-Environmental Impact Assessment (AEIA) and Determination of Water Logged Area of South of the Padma River (Faridpur, Rajbai and Gopalgonj Districts) | Bangladesh Agricultural Development Corporation (BADC) | GoB | 2011 |
| Bangladesh | Environmental Impact Assessment (EIA) study along the selected route of the proposed Gas transmission pipeline from Moheshkhali to Anowara | GTCL | GoB | 2011-2012 |
| Bangladesh | Consulting Services for Installation of Natural Gas Compressor Stations at Ashuganj & Elenga | GTCL | ADB | 2011-2013 |
| Bangladesh | Participatory Rural Appraisal (PRA) for Proposed Sub-projects under Participatory Small Scale Water Resources Sector Project (PSSWRSP) | LGED | ADB | 2011-2014 |
| Bangladesh | Consultancy Services to Provide Technical Assistance to PMU, DWSSP of DWASA | Dhaka WASA | IDA | 2011-2014 |
| Bangladesh | Char Development and Settlement Project-IV (CDSP lV) | BWDB, LGED & DoF | Government of Netherlands & IFAD | 2011-2021 |
| Bangladesh | Construction of a Concrete Grain Silo at Mongla Port with Facilities (50,000 MT Capacity) | Ministry of Food & Disaster Management of the GoB | Japan Debt Cancellation Fund (JDCF) | 2011-2014 |
| Bangladesh | Mid-Term Evaluation/Assessment of Primary Stipend Education Project (PESP) | Primary Stipend Education Project | GoB | 2011 |
| Bangladesh | Feasibility Study for Integrated Water Management Project of Gungiajuri Haor Area | BWDB | GoB | 2010-2011 |
| Bangladesh | ADB, TA, Primary Education Sector Development Program (PESDP) | Primary and Mass Education Division (PMED) | ADB | 2010 |
| Bangladesh | Providing Investigation & Feasibility Study of Rubber Dam under Construction of Rubber Dams in Small & Medium Rivers for Increasing of Food Production Project (Package-1) | LGED | GoB | 2010-2012 |
| Bangladesh | Ground Water Management and TPP for Survey, Investigation and Feasibility Study in Upazilla and Growth Center Level Pourasava having no Piped Water System under Mathematical Modelling for Surface Water Source Identification | DPHE | GOB | 2010-2012 |
| Bangladesh | Institutional Development Consultants under Karnaphuli Water Supply Project (KWSP) | Chittagong WASA | JICA | 2010-2012 |
| Bangladesh | Public Campaign Assistance for The Project for Advancing NRW Reduction Initiative of Chittagong WASA | Chittagong WASA | JICA | 2010-2011 |
| Bangladesh | Test Excavation and Supplemental Topographic Survey of Distribution Network for The Project for Advancing NRW Reduction Initiative of Chittagong WASA | Chittagong WASA | JICA | 2010-2011 |
| Bangladesh | Field Verification and Underground Utility Survey of Distribution Network for The Project for Advancing NRW Reduction Initiative of Chittagong WASA | Chittagong WASA | JICA | 2010-2011 |
| Bangladesh | GIS Mapping of Distribution Network for The Project for Advancing Non Revenue Water (NRW) Reduction Initiative of Chittagong WASA | Chittagong WASA | JICA | 2010-2012 |
| Bangladesh | Water Supply System Expansion and Rehabilitation of Narayangonj Town. | Dhaka WASA | GoB | 2010-2012 |
| Bangladesh | Technical Assistance to Provide Supervision Services of the Project Implementation for Saidabad Water Treatment Plant Project Phase II | Dhaka WASA | DANIDA | 2010-2014 |
| Bangladesh | Provision of Additional Environmental Monitoring Services | TULLOW Bangladesh Ltd. | TULLOW | 2010-2012 |
| Bangladesh | Environmental Monitoring Services of TBL at Bangora, Comilla. | TULLOW Bangladesh Ltd. | TULLOW | 2010 |
| Bangladesh | Greater Dhaka Sustainable Urban Transport Corridor TA Nº: 7415 | ADB | ADB | 2010-2011 |
| Bangladesh | Hiring Professionals / consultants to execute soft components under Greater Rajshahi District Integrated Rural Development project (GRDIRDP) | LGED, GRDIRDP | IDA | 2010 |
| Bangladesh | Socio-economic Baseline Survey for SRIIP-3 | SRIIP, LGED | ADB | 2010 |
| Bangladesh | Developing a National Management Information System (MIS) | Ministry of Local Government, Rural Development & Cooperatives | GOB | 2010-11 |
| Bangladesh | Drill Stem Testing-Group: A (drilling of one new well at Bakhrabad gas field). Group: A (Workover / Recompletion of Two Nos. Existing Well at Bakhrabad gas field) | BGFCL | GOB | 2010 |
| Bangladesh | Feasibility Study for Capacity-Building Project for Sustainable Development of Water-Related Infrastructure Part-2 | JICA Expert | JICA | 2010-2011 |
| Bangladesh | Feasibility Study and Detailed Design (FSDD) of Subprojects under the Participatory Small Scale Water Resources Sector Project in Greater Mymensingh, Sylhet and Faridpur Areas | LGED | ADB | 2010-2013 |
| Bangladesh | Developing a National Management Information System (MIS) for Water Supply and Sanitation in Bangladesh | Ministry of Local Government, Rural Development & Cooperatives | GOB | 2010-2011 |
| Bangladesh | Feasibility Study for Sureswar Flood Control, Drainage & Irrigation Project (Main Consultant) | BWDB | GoB | 2010 - Ongoing |
| Bangladesh | Baseline Survey of the Urban Partnerships for Poverty Reduction Project (UPPR) | United Nations Development Programme (UNDP) | IDA & GoB | 2009-2010 |
| Bangladesh | Review and Revision of Sector Development Program for Water Supply and Sanitation Sub-sector in Bangladesh | PSU, LGED | DANIDA | 2009-2010 |
| Bangladesh | Construction and Renovation of Solid Waste Management (SWM) Office at Word No. 5,7,9, 42 , 49,50,53, | Japan International Co-oparation Agency (JICA) | JICA & DCC | 2009 |
| Bangladesh | Supervision of 7 Nos. of Bridge Construction Work of Purbachal New Town Project | Rajdhani Unnayan Kartripakkha (RAJUK) | GOB | 2009-2011 |
| Bangladesh | Feasibility Study and Detailed Engineering for Ganges Barrage | BWDB | Government of Bangladesh (GoB) | 2009-2013 |
| Bangladesh | Flood Damage Rehabilitation -2007 Works Under WMIP (Contract Package no : BWDB:S-8.1) | BWDB | IDA | 2009-2011 |
| Bangladesh | Dhaka Integrated Environment & Water Resources Management Project (DIEWRMP) | Dhaka WASA | IDA | 2009-2010 |
| Bangladesh | Feasibility Study for Khulna Water Supply Improvement Project in the People's Republic of Bangladesh | NJS Consultants Co. Ltd. | JICA | 2009 |
| Bangladesh | Formulation of National Guidelines on Water Safety Framework (WSF) in Bangladesh | DPHE | DANIDA | 2009-2010 |
| Bangladesh | National Consultant to Conduct a Study on Governance of Union Parishad (UP) in HYSAWA Project Areas | LGSU, HYSAWA Project | DANIDA | 2009-2010 |
| Bangladesh | Feasibility Study for Khulna Water Supply Improvement Project (Technical Work of Water Quality analysis) in the People's Republic of Bangladesh | NJS Consultants Co. Ltd | JICA | 2009-2010 |
| Bangladesh | Environmental and Social Assessment (ESA) under the Dhaka Integrated Environment and Water Resources Management Project (package S-6) | Department of Environment (DOE) | IDA | 2009-2010 |
| Bangladesh | Baseline Survey of SIPP Additional Financial and SIPP-II | Social Development Foundation (SDF) | IDA | 2009-2010 |
| Bangladesh | Consumer Survey for Performance Evaluation of Third Natural Gas Development Project & Ninth Power Project | ADB | ADB | 2009 |
| Bangladesh | Construction and Renovation of Solid Waste Management (SWM) Office at Word No. 5,7,9, 42 , 49,50,53 | JICA | JICA & DCC | 2009 |
| Bangladesh | Civil Works Construction Supervision Consultants (CSC) Services for Construction of Core Family shelter Phase-II | UNDP | UNDP | 2009-2010 |
| Bangladesh | Design and Management Consultancy (DMC) of Dhaka Water Supply Sector Development Project (DWSSDP) | Dhaka WASA | ADB | 2009-2014 |
| Bangladesh | Water Supply Sanitation and Drainage Project in Sylhet and Barisal City | DPHE | GOB | 2008-2012 |
| Bangladesh | Conducting EIA for Gopalnagar to Bangora Gas Gathering Pipeline | TULLOW Bangladesh Ltd. | TULLOW | 2008 |
| Bangladesh | Construction of Solid Waste Management (SWM) Office at Word No. 56, 63,69 and 76 | Japan International Co-oparation Agency (JICA) | JICA & DCC | 2008 |
| Bangladesh | The Programme for Construction of Multipurpose Cyclone Shelters In The Area Affected By The Cyclone SIDR (Survey, Investigation and Design) | Yachiyo Engineering Co. Ltd., Japan | JICA | 2008 |
| Bangladesh | The Programme for Construction Of Multipurpose Cyclone Shelters in the Area Affected by the Cyclone SIDR (Construction Supervision & Defect Liability Inspection) | Yachiyo Engineering Co. Ltd., Japan | JICA | 2008-2010 |
| Bangladesh | Study on the present Power Supply Situation and Its Impacts on the Readymade Garment Sector in Bangladesh | Bangladesh Garment Manufacturers & Exporters Association (BGMEA) | BGMEA | 2008 |
| Bangladesh | Working as Support Organizations in Northwest Districts under the Water Supply and Sanitation Sector Support Programme, Phase II (WSSPS-II) | Local Government Support Unit (LGSU), DPHE | DANIDA-HYSAWA | 2008-2010 |
| Bangladesh | Construction of Solid Waste Management (SWM) Office at Word No. 56, 63,69 & 76 | JICA | JICA & DCC | 2008 |
| Bangladesh | Brief Cost Estimation and Hydraulic Analysis of Pipe Network Water Supply of Detailed Planned Area of Chittagong | CWASA | KOICA | 2008 |
| Bangladesh | Study on the present Power Supply Situation and Its Impacts on the Readymade Garment Sector in Bangladesh | Bangladesh Garment Manufacturers & Exporters Association (BGMEA) | Gtz | 2008-2009 |
| Bangladesh | Review and Revisions of the Sector Development Programme (SDP) for the Water and Sanitation Sub-sector in Bangladesh | Policy Support Unit (PSU), Sector Policy Support for the Water Supply and Sanitation Sector, Local Government Division | GoB-Danida | 2008-2009 |
| Bangladesh | Design and Management Consultants (DMC)" of Dhaka Water Supply Sector Development Project (DWSSDP) | Dhaka WASA | Asian Development Bank (ADB) | 2008-2009 |
| Bangladesh | Detail Engineering Design for Kurigram Irrigation Project (North Unit) | BWDB | Government of Bangladesh (GoB) | 2008-2009 |
| Bangladesh | Evaluate the Rural Maintenance Programme (RMP-Phase-III) | HTSPE Limited, | HTSPE Limited, UK | 2008 |
| Bangladesh | Engineering Consultancy Services for Detailed Design, Construction, Supervision and Related Services under Karnaphuli Water Supply Project | CWASA | JBIC | 2008-2011 |
| Bangladesh | Engineering Consulting Services for Mohara & Kalurghat Water Treatment Plant Rehabilitation | CWASA | JDCF | 2008-2010 |
| Bangladesh | JBIC Special Assistance for Project Implementation (SAPI) for Dhaka-Chittagong Railway Development Project | Bangladesh Railway | JBIC | 2008 |
| Bangladesh | Support Organization (SO) in Barisal Region under the Water Supply and Sanitation Sector Support Program | LGSU | DANIDA-HYSAWA | 2008-2011 |
| Bangladesh | Pre-feasibility Study for Drainage Improvement of Dhaka-Narayangonj-Demra (DND) Irrigation Project | IDEA Consultants Inc., Japan | IDEA Consultants Inc., Japan | 2007-2008 |
| Bangladesh | Command Area Development Project-II | BWDB | Asian Development Bank (ADB) | 2007-2008 |
| Bangladesh | Environmental Management Plan (EMP) Study for Drilling of Wellsat Kailashtilla Gas Fields Well no 3 & 4 | Sylhet Gas Field Ltd. (SGFL) | GOB | 2007-08 |
| Bangladesh | Environmental Management Framework (Package DS-5 | DWASA | IDA | 2007 |
| Bangladesh | Carrying out Performance and Financial Auditing (FA) of 4 ADB Funded Road Transport Project in Bangladesh. | RHD | ADB | 2007-2010 |
| Bangladesh | Seminar (Foreign Training), Environmental & Safety Issues in Pipeline Design and Construction | Titas Gas Transmission and Distribution Co. Ltd. (TGTDCL) | TGTDCL | 2007 |
| Bangladesh | Estuary Development Program (EDP) (under Dutch Assistance) | Bangladesh Water Development Board (BWDB) | GoN (Govt. of Netherlands) | 2007-2010 |
| Bangladesh | Service and Design of Treatment Plant (Iron - Arsenic) at Hobiganj under ¿Rehabilitation and Development of Water Supply System in Pourashavas including regeneration of Tubewell project | Department of Public Health Engineering (DPHE) | GoB | 2007-2008 |
| Bangladesh | Consulting Services for Generation Support Framework and Financing Strategy to Implement Least Cost | Power Cell | IDA | 2007 |
| Bangladesh | Conducting Detailed Engineering Design and Construction Supervision of Water Supply and Environmental Sanitation Project in Mongla Pourashava, Mongla, Bagerhat | DPHE | GoB | 2007-2008 |
| Bangladesh | Feasibility Study and Design of Sub Projects in three Selected Pourashava | Local Government Engineering Department (LGED)/GHD, Australia | GoB | 2007 |
| Bangladesh | Execute the BETV-SAM (Bangladesh Environmental Technology Varification- Support to Arsenic Mitigation) Verification Field Testing. | OCETA | OCETA | 2006 |
| Bangladesh | Study on Comprehensive Assessment / Evaluation of the Primary Education Stipend Project (PESP) | Directorate of Primary Education | GOB | 2006 |
| Bangladesh | Carrying out Performance and Financial Auditing (FA) under ADB assisted "Emergency Flood Damage Rehabilitation Project" 2004. (Part: A Rural Infrastructure & Part E: Municipal Infrastructure) ADB Loan # 2156-BAN (SF). | Local Government Engineering Department (LGED) | ADB | 2006-2007 |
| Bangladesh | JBIC Special Assistance for Project Formation (SAPROF) for Dhaka-Chittagongn Trunk Railway Transportation Capacity Enhancement Project | Bangladesh Railway | JBIC | 2006 |
| Bangladesh | Bangladesh Environmental Technology, Verification-Support to Arsenic Mitigation (BETV-SAM) Project | Ontario Centre for Environmental Technology Advancement (OCETA) | CIDA | 2006 |
| Bangladesh | Rendering Services for Data collection for the JBIC Environmental Profile Study in the Republic of Bangladesh | NIPPON KOEI CO., LTD | JBIC | 2006 |
| Bangladesh | Environmental Impact Assessment (EIA) for Construction of Gas Distribution Network at Rajshahi City and its Adjoining Areas | PGCL | GoB | 2006 |
| Bangladesh | IEE, EIA and RP for Construction of Bheramara-Khulna (165Km.) Gas Transmission Pipeline | GTCL | GoB | 2006 |
| Bangladesh | Procurement of Environmental Services for Drilling and Workover/Recompletion of 8 wells at Titas and Bakhrabad gas fields and Installation of Gas Process Plants at Titas Gas field | BGFCL | GoB | 2006 |
| Bangladesh | Monitoring of Environmental and Social Performance of Lafarge Surma Cement | Lafarge Surma Cement Limited. | Lafarge Surma Cement Limited. | 2006-10 |
| Bangladesh | Drill Stem Testing and Production Testing Services for Kailashtilla Gas Field Well no 5 & 6 | Sylhet Gas Field Ltd. | GOB | 2006 |
| Bangladesh | Assessment of Impact of Smallholder Livestock Development Project (SLDP 2) in Five Southern Districts, Bangladesh | Department of Livestock Services | DANIDA | 2006 |
| Bangladesh | Consulting Services for Assessment of Procurement Management Capacity and Its Institutionalization | World Bank | World Bank | 2006 |
| Bangladesh | Performance and Financial Audit Services (PFAS) on Emergency Flood Damage Rehabilitation Project | LGED | ADB | 2006-2007 |
| Bangladesh | Supervision of CWASA Madunaghat Water Supply Project (Surface Water) | CWASA | Italian Govt. | 200620-09 |
| Bangladesh | Conducting Inception Report, Feasibility study and Project Proposal of " Rural Piped Water Supply Scheme" in Shakrail and Chandhair Villages; Manikganj Sadar Upazila under Manikganj District. | Sukhi Paribar Sangstha (SPS), BAMWSP, DPHE | WB | 2006 |
| Bangladesh | Preparation of Inception Report, Conducting Feasibility study and Preparation of Project Proposal of " Rural Piped Water Supply Scheme" in Baliapur Village; Bongaon Union under Savar Upazila of Dhaka with the financial Assistance of BWSPP | Human and Environmental Welfare Association (HEWA), BAMWSP, DPHE | WB | 2006 |
| Bangladesh | Dhaka Water Supply Project (ADB TA No. 4651 BAN) | Dhaka Water Supply & Sewerage Authority (DWASA) | ADB | 2006 |
| Bangladesh | Small Scale Private Service Provider in Water Supply and Electricity. | Associati, Italy | WB | 2006 |
| Bangladesh | Feasibility Study of Karnafuli Water Supply Project | CWASA | JBIC | 2005 |
| Bangladesh | Inventory Survey Related to Water Resources Development in Greater Mymensingh | LGED | JICA | 2005 |
| Bangladesh | Feasibility Study for Integrated Water Resources Management of Chalan Beel Area including Halti Development Project | BWDB | GoB | 2005-2007 |
| Bangladesh | Char Development and Settlement Project-III | Dutch Embassy | GoN | 2005-2010 |
| Bangladesh | Consultancy services for updating / upgrading feasibility study of three sub-project under group-A (Teesta irrigation project (Phase-II); | BWDB | GOB | 2005 |
| Bangladesh | Master Plan on Small Scale Water Resources Development at Union and Upazila Level | LGED | JICA | 2005 |
| Bangladesh | Conduct ¿Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) of Central Effluent Treatment Plant (CETP) and other Industrial Installations in the Proposed Tannery Estate, Dhaka | BSCIC | GOB | 2005 |
| Bangladesh | Detailed Feasibility Study & Environment Impact Assessment of Haripur 150MW CCPP Project | BPDB | GOB | 2005-2006 |
| Bangladesh | TA # 4379-BAN: Power Sector Development Program II | Nexant, USA | ADB | 2005 |
| Bangladesh | Consulting Services for Preparation/Development of Gas Sector Master Plan and Strategy for Bangladesh | Wood Mackenzie | WB | 2005 |
| Bangladesh | Research study on ¿The informal sector of employment in Bangladesh, and how this sector could be mobilized to eliminate worst forms of child labour and increase job opportunities¿ | International Labour Organisation (ILO) | ILO | 2005 |
| Bangladesh | Feasibility Study and Preparation of Project Proposal on Rural Piped Water Supply Scheme | Assistance for Development Programs (ADP) / BAMWSP, | World Bank (WB) | 2005 |
| Bangladesh | Design of drainage system of Eastern Housing Pallabi Phase II Land Project. | Eastern Housing Ltd. | EHL | 2005 |
| Bangladesh | Feasibility Study and Preparation of Project Proposal on Rural Piped Water Supply Scheme | Assistance for Development Programs (ADP) / BAMWSP / DPHE | WB | 2005 |
| Bangladesh | Sample Survey for Region-Wise Drinking Water Supply Coverage | Unit for Policy Implementation (UPI) | DANIDA | 2005 |
| Bangladesh | Karnafuli Water Supply Project | CWASA | JBIC | 2005 |
| Bangladesh | Construction of 230 KV Transmission Lines and Substations under West Zone Power System Development Project | PGCB | ADB | 2005-2007 |
| Bangladesh | Carrying out Performance and Financial Auditing (FA) under ADB assisted "Emergency Flood Damage Rehabilitation Project" 2004. (Part: B Roads) ADB Loan # 2156-BAN (SF). | Roads and Highway Department (RHD) | ADB | 2005-2007 |
| Bangladesh | Evaluation of Participating NGO of Agriculture Diversification and Intensification Project | ADIP, DAE | IFAD | 2004 |
| Bangladesh | Management Information Acquisition under the Project Solid Waste Management in Dhaka City | PCI, Japan | JICA | 2004 |
| Bangladesh | Water Quality Analysis Survey | PCI, Japan | JICA | 2004 |
| Bangladesh | Diesel Engine Maintenance Improvement Clinics | AQMP, DOE | IDA | 2004 |
| Bangladesh | Recycling Market Study | PCI, Japan | JICA | 2004 |
| Bangladesh | Waste Generation Amount and Composition Survey | PCI, Japan | JICA | 2004 |
| Bangladesh | Feasibility Study of Banderban Pourashava Water Supply Municipal Services Project : IDA Credit No. 3177-BD | LGED | IDA | 2004-2005 |
| Bangladesh | Removal of Water Logging in Dhaka City | DWASA | GoB | 2004-2005 |
| Bangladesh | Baseline Environmental Study on Seismic Program at Block 12 Area | UNOCAL | UNOCAL | 2004 |
| Bangladesh | Preparation of IEE, EIA, RP report on West Bank of Jamuna Bridge- Nalka- Hatikamrul- Bonpara- Ishwardi- Bheramara Gas Transmission Pipeline Project (Group-A) and Bonpara-Rajshahi Gas Transmission Pipeline Project (Group-B) | GTCL | GOB | 2004-05 |
| Bangladesh | IEE and EIA, RP of Bonpara-Rajshahi (50 Km) Gas Transmission Pipeline - Group B | GTCL | GoB | 2004 |
| Bangladesh | District Water Resources Assessment under Second Small Scale Water Resources Development Sector Project ¿ ADB Loan No. 181 BAN(SF) of LGED | LGED | ADB | 2004-2005 |
| Bangladesh | Topographical and Bathymetric Surveys and Geotechnical Investigations of the Project Site for 450 MW Combined Cycle Power Plant at Sirajganj | SUMMIT Industrial & Mercantile Corporation | Private | 2004 |
| Bangladesh | Explore the Causes of Failure of a Wave Protection Wall of FPP | CARE-Bangladesh | CARE-Bangladesh | 2004 |
| Bangladesh | Construction of 230KV Transmission Lines and Substations under West Zone Power System Development Project | PGCB | ADB | 2004-2007 |
| Bangladesh | Conducting Survey for Collection of Field Level data for NOPOEST and LIFE Projects | FAO | IFAD | 2004 |
| Bangladesh | Conducting Participatory Rural Appraisal (PRA) in Integrated Agriculture Development Project in Greater Sylhet District Including Orange and Pineapple Development | Department of Agricultural Extension (DAE) | GOB | 2004 |
| Bangladesh | Geotechnical Investigation for the Feasibility Study of the Padma Bridge | JICA | JICA | 2004 |
| Bangladesh | Topographical Survey & Hydrological Investigation (Ph-II) for Feasibility Study of the Padma Bridge | JICA | JICA | 2004 |
| Bangladesh | Topographical Survey for the Project on Strengthening of Water Examination System | Kokusai Kogyo Co., Japan | JICA | 2004 |
| Bangladesh | Socio-Economic Monitoring and Impact Evaluation of Rural Electrification and Renewable Energy Program in Bangladesh under Bangladesh Rural Electrification and Renewable Energy Development Project | Rural Electrification Board (REB) | IDA | 2004-2005 |
| Bangladesh | Construction of a Container Terminal at New Mooring, Chittagong, Bangladesh | Chittagong Port Authority (CPA) | CPA | 2004-2005 |
| Bangladesh | Socio-economic Monitoring and Impact Evaluation of Rural Electrification and Renewable Energy Program in Bangladesh | Rural Electrification Board (REB) | World Bank | 2004-2005 |
| Bangladesh | Rural and Arsenic Transition Component Description under the Second Phase Water and Sanitation Sector Program Support (WSSPS II) in Bangladesh | The Royal Danish Embassy | DANIDA | 2004 |
| Bangladesh | JBIC Chittagong Study | JBIC | JBIC | 2003 |
| Bangladesh | Environmental Impact Assessment (EIA) and Baseline Study (BLS) of Blocks 5 & 10 | SHH | (SHH) | 2003 |
| Bangladesh | Initial Environmental Examination (IEE) & Environmental and Social Assessment (ESA) For Blocks 5 & 10 | Shell Hydrocarbons Holdings B.V. (SHH) | SHH | 2003 |
| Bangladesh | IEE, EIA & RP of Proposed Monohordi-Elenga-East Bank of Jamuna Bridge Gas Transmission Pipeline | GTCL | WB | 2003-04 |
| Bangladesh | IEE, EIA & RP of Proposed Nalka-Bogra Gas Transmission Pipeline | GTCL | WB | 2003-04 |
| Bangladesh | IEE, EIA & RP on Ashugonj-Monohordi Gas Transmission Pipeline | GTCL | WB | 2003-04 |
| Bangladesh | Environmental Impact Assessment - Moulavi Bazar Development (Group-1 & Group-2) | UNOCAL | UNOCAL | 2003-04 |
| Bangladesh | FAP-21 Monitoring and BWDB Training Project | BWDB | KfW | 2003-2005 |
| Bangladesh | Detail Design and Construction Supervision (Phase-II) of Shrimp and Aquaculture Component under Fourth Fisheries Project | BWDB | WB | 2003-2006 |
| Bangladesh | Data Collection, Engineering Surveys, Feasibility Studies and Detailed Design of Small Scale Water Resources Development Sector Project (SSWRDSP) | LGED | ADB | 2003 -2007 |
| Bangladesh | The Workshop on Improvement of Flood Forecasting and Warning System in Bangladesh | Nippon Koei Co. of Japan | JICA | 2003 |
| Bangladesh | Natural Condition Survey (Hydrology & Topography) for the Feasibility Study of Padma Bridge (Phase-I) | Nippon Koei Co. Ltd., Japan | JICA | 2003 |
| Bangladesh | Environmental & Social Impact Assessment to Support Feasibility Study for Improvement of Navigability of Mongla Port | Mongla Port Authority | GOB | 2003-2004 |
| Bangladesh | Environmental Technology Verification-Arsenic Mitigation Program-Field Testing of AM Technologies (ETV-AM Field Testing) | OCETA | CIDA | 2003 |
| Bangladesh | Identify and Diagnosing Problems Including the Recommendation of Remedial Measurement for Smooth Operation and Maintenance of Dholaikhal Pumping Station after Determining Workability and Present Condition | DWASA | GoB | 2003 |
| Bangladesh | Monitoring and Rapid Assessment of Month-Long Sanitation Campaign in Bangladesh | Unit for Policy Implementation (UPI) | DFID | 2003 |
| Bangladesh | Feasibility Study of Chandpur Comilla Integrated FCDI Project | BWDB | GoB | 2003-2004 |
| Bangladesh | Detailed Design & Construction Supervision of Fish-Pass and Fish-Friendly Structures-Phase-II under Fourth Fisheries Project | BWDB | IDA | 2003-2004 |
| Bangladesh | Study on Multipurpose Cyclone Shelter Project in Feni, Cox¿s Bazar, Chittagong | Japan Engineering Co. | JICA | 2003 |
| Bangladesh | Second Small Scale Water Resources Development Sector Project for Forming, Establishing functioning WMCAs and Assist LCS Activities | LGED | ADB | 2003-2005 |
| Bangladesh | Support for Rural Livelihoods Programme in Bangladesh | DFID | DFID | 2003-2006 |
| Bangladesh | Impact Study on C-in-Ed Training of PTT under the Directorate of Primary Education of PMED | Directorate of Primary Education | IDA | 2003 |
| Bangladesh | Monitoring and Rapid Assessment of Month-long Sanitation Campaign in Bangladesh | The Unit for Policy Implementation (UPI) | DFID | 2003 |
| Bangladesh | ADB TA : Organizational Reform of Bangladesh Railways (Phase-III) | Bangladesh Railway | ADB | 2002-2003 |
| Bangladesh | ADB TA : Regional Traffic Enhancement Project, Bangladesh Railway | Bangladesh Railway | ADB | 2002 |
| Bangladesh | Strengthening of Livestock Information Services (SLIS), Mid Term Review Mission | European Commission (EC) Brussels, Belgium | ADB | 2002 |
| Bangladesh | Consulting Services on Preparation of Annual MIS Report for 2000-01 & 2001-02 and Development of Database for Textile Sub-sector from 1972-73 to 2001-02 | Textile Strategic Unit, Ministry of Textile | IDA | 2002 |
| Bangladesh | Installation of Local Area Network (LAN) Facilities in Petrobangla Head Office | Petrobangla | DFID | 2002 |
| Bangladesh | Access Institute For Business Informatics (AIBI) | Undergraduate students | AIBI | 2002-03 |
| Bangladesh | Shopping, Commercial & Islamic Centre at Chawk Bazar | CBSMC | CBSMC | 2002-2003 |
| Bangladesh | Improved Performance of Bangladesh¿s Energy Sector (Individual Contract) | USAID | USAID | 2002-2004 |
| Bangladesh | Improved Performance of Bangladesh Energy Sector | PA Consulting Services Inc. | World Bank | 2002-2003 |
| Bangladesh | Consultancy Services to Conduct ¿Socio-economic Baseline Survey¿ for the BUILD Component under the Integrated Food Security Program (IFSP) of CARE-Bangladesh | CARE, Bangladesh | USAID | 2002 |
| Bangladesh | Tubewell Screening, Map Preparation and Social Survey In Keshabpur Thana, Jessore | KUKUSAI KOGYO CO. LTD. | JICA | 2002 |
| Bangladesh | Study of Organizational Capability of CWASA & DWASA | CWASA & DWASA | JBIC | 2002 |
| Bangladesh | User Level Survey, Institutional Review Phase-I, Water Supply and Sanitation Sector | DPHE | DFID | 2002 |
| Bangladesh | Inventory Survey on Meteorological and Hydrological Observation System and Electric Communication System under feasibility Study for Improvement of Flood Forecasting and Warning System | Nippon Koei Co. of Japan | JICA | 2002-2003 |
| Bangladesh | Survey on Evacuation Condition and Awareness of Flood Victim" for the Feasibility Study for Improvement of Flood Forecasting and Warning Services in Bangladesh | Nippon Koei Co. of Japan | JICA | 2002-2003 |
| Bangladesh | Sustainable Water Management in Chittagong Hill Tracts Region | GFA Terr Systems GmbH, Germany | Netherlands Govt. | 2002 |
| Bangladesh | Establishment of X, Y, Z Coordinates in Companyganj Area, Comilla | BAPEX | BAPEX | 2002-2003 |
| Bangladesh | Environmental and Social Impact Assessment for Construction of Gas Pipeline and other Installations under Dhaka Clean Fuel Project (TGTDCL Part) | TGTDCL | ADB | 2002 |
| Bangladesh | Environment and Social Impact Assessment of Bangabandhu Bridge Approach Road Gas Pipeline Project | Titas Gas T&D Co. Ltd. | GOB | 2001-02 |
| Bangladesh | Feasibility Study (Phase-I) of Fish-Pass and Fish-Friendly Structures under Fourth Fisheries Project | BWDB | WB | 2001 |
| Bangladesh | Study for Rural Development Focusing on Flood Proofing in Bangladesh, 2001 | LGED | JICA | 2001-02 |
| Bangladesh | Environmental Impact Assessment (EIA) for Installation of a Gas Process Plant, Condensate Fractionation Plant and 10 Km. 10 Inch dia Gas Pipeline Project at Fenchuganj Gas Field | BAPEX | GOB | 2001-02 |
| Bangladesh | Feasibility Study (Phase-1) of Shrimp and Coastal Aquaculture Project | BWDB | WB | 2001 |
| Bangladesh | Rehabilitation and Privatization of Eight Ferry Services in Patuakhali and Barguna | Roads and Highway Department (RHD) | DANIDA | 2001-2003 |
| Bangladesh | Design of Water Treatment Plants at Rajbari, Serajganj and Chandpur Pourashava (Municipality) | DPHE | GOB | 2001-2002 |
| Bangladesh | Formulation of Standard Design Criteria for Urban Water Supply & Sanitation in Bangladesh | DPHE | WHO | 2001-2002 |
| Bangladesh | Baseline Survey /Participatory Rural Appraisal (PRA)/ for Agricultural Development Support to Adivashi and Char land Areas for SAIP of DAE | DAE | IFAD | 2001 |
| Bangladesh | Corporation of Ashuganj Power Station (ADB TA Project), Phase-I & II | BPDB | ADB | 2001-2003 |
| Bangladesh | Australian Youth Ambassador for Development Program (AYADP) ¿ in-Country Management for Bangladesh (ICM 04/06/01B) | Australian Youth Ambassadors for Development Program, Australia | AUSAID | 2001-03 |
| Bangladesh | JICA Study for Rural Development Focusing on Flood Proofing (Survey on Agriculture and Water use), 2001 | SANYU Consultant Inc. Japan | JICA | 2001 |
| Bangladesh | Expansion of Irrigation Through Utilization of Surface Water by Double Lifting (1st Phase) | BADC | GOB | 2001-2004 |
| Bangladesh | Study on Options for Ganges Dependent Area (GDA) Project | BWDB | WB | 2001 |
| Bangladesh | Urban Transport and Environmental Improvement Project | Bangladesh Road Transport Corporation (BRTC) | ADB | 2001 |
| Bangladesh | EIA study of Meghnaghat Combined Cycle Gas Turbine Power Plant (Phase II) Project | MARUBENI | GoB | 2001 |
| Bangladesh | EIA Study of Mymensingh Combined Cycle Gas Turbine Power Plant Conversion Project | Rural Power Company (RPC) | KFW | 2001 |
| Bangladesh | Participatory and Partnership Approach (PPA) Consultancy for Municipal Services Project | LGED | IDA | 2000-2003 |
| Bangladesh | Report on the Massive Death of Marine Turtles | Shell Bangladesh | Shell Bangladesh | 2000-01 |
| Bangladesh | Social Impact Assessment of Block 15 (Sandwip) & Stakeholder Identification of Block 5 & 10 (Bhola & Sundarban) | Shell Bangladesh Exploration & Development B.V | Shell Bangladesh | 2000 |
| Bangladesh | Social Impact Assessment (SIA) of Magnama-1, Block-16, Offshore Kutubdia Island | Shell Bangladesh Exploration & Development B.V. | Shell Bangladesh | 2000-01 |
| Bangladesh | Air Quality Test in Dhaka City (Lead Sampling) | Shell Bangladesh Exploration & Development B.V. | Shell Bangladesh | 2000-01 |
| Bangladesh | Environmental Impact Assessment (EIA) for 3D Seismic (4C/3D) Acquisition over Sangu Field in Block 16 | Shell Bangladesh Exploration & Development B.V. | Shell Bangladesh | 2000 |
| Bangladesh | Initial Environmental Examination (IEE) on Granular Single Super Phosphate of Hussain Chemical Complex | Hussain Chemical Complex | Private Financed | 2000 |
| Bangladesh | Environmental Impact Assessment (EIA) on the Industrial Activities (Tanneries and Other Industries) at Hazaribag Area | UNDP | UNDP | 2000 |
| Bangladesh | Identification, Verification, Valuation & Recording of Fixed Assets and Stores of all Unit Offices under the payment jurisdiction of Regional Accounting Office (RAO), Sikalbaha Power Station, BPDB, Shikalbaha | BPDB | BPDB | 2000 |
| Bangladesh | Identification, Verification, Valuation & Recording of Fixed Assets and Stores of all Unit under Regional Accounting Office (RAO), Chittagong Electric Supply, BPDB, Chittagong | BPDB | BPDB | 2000 |
| Bangladesh | Assessment of Groundwater Resources and Their Optimal Utilization and Protection in the Coastal Belt of Bangladesh | DPHE | DANIDA | 2000-2001 |
| Bangladesh | Study of the Groundwater Development of Deep Aquifers for Safe Drinking Water Supply to Arsenic Affected Areas in Western Bangladesh | DPHE | JICA | 2000-2001 |
| Bangladesh | Feasibility Study on the Development of the Char Baggar Dona Area | CDSP | DGIS | 2000-2002 |
| Bangladesh | Study and Detailed Design of Iron Removal Plant (Approx. Capacity 500M3/D) at Chittagong BIT | DPHE | GOB | 2000 |
| Bangladesh | Extension and Expansion Project of Mohora Water Treatment Plant, CWASA | CWASA | JICA | 2000 |
| Bangladesh | Consultancy Services for DPHE-DANIDA Water Supply and Sanitation Components (CCU) | DPHE | DANIDA | 2000 |
| Bangladesh | Rapid Assessment of Household Level Arsenic Mitigation Techniques | DPHE | DFID | 2000 |
| Bangladesh | Preparation of GIS Based Ecological Maps | Ministry of Env. & Forest | GOB | 2000 |
| Bangladesh | Promotion of Environmental Management Systems (EMS: ISO 14001) Project | WB | UNDP | 2000-01 |
| Bangladesh | A Study on the Impact of Polder Rehabilitation on the NIAPWMP | DAE | IFAD | 2000 |
| Bangladesh | Development of Design Manual for Structural Flood Proofing Measures | CARE, Bangladesh | USAID | 2000 |
| Bangladesh | Feasibility Study for Re-Excavation of Betna River and Branch Khal | BWDB | GOB | 2000 |
| Bangladesh | A special study on Potentials and Constraints of Oilseeds Production in Netrokona | DAE | IFAD | 1999 |
| Bangladesh | Environmental Impact Assessment for Hasnabad-Amin Bazar (Savar)-Tongi (50 km) and Haripur-Meghnaghat (10 km) 230 kV Transmission line project under Dhaka Power System upgrade project | PGCB | ADB | 1999 |
| Bangladesh | EIA for Reju-1 Offshore Exploration Drilling Well in Block 17 | Okland Oil Company | Okland Oil Company | 1999 |
| Bangladesh | Detail Assessment of Damage caused by Recent Flood in the Sewer System of DWASA due to Recent Devastating Flood | DWASA | WB | 1999 |
| Bangladesh | Detail Assessment of Damage caused and Rehabilitation required in Water Supply System of Dhaka WASA due to Recent Devastating Flood. | DWASA | WB | 1999 |
| Bangladesh | Redesign and Monitoring of Distribution System in Different Pourashava under "Tube-well Regeneration and Water Supply System Rehabilitation and Development in 20 Pourashavas" | DPHE | GOB | 1999 |
| Bangladesh | Resettlement Action Plan (RAP) for Hasnabad-Amin Bazar (Savar)-Tongi (50 km) and Haripur-Meghnaghat (10 km) 230 kV Transmission line project under Dhaka Power System upgrade project. | PGCB | GOB, ADB | 1999 |
| Bangladesh | Design of Overhead Water Tank and Iron Removal Plant under "23 Towns Water Supply Project | DPHE | GOB | 1999-2000 |
| Bangladesh | The Third Rural Infrastructure Development Project (Institutional Support) | LGED | ADB, SIDA, IFAD & OECF | 1999-2003 |
| Bangladesh | IDB Assisted Water Supply and Sanitation Project in the Coastal Belt Areas of Bangladesh | DPHE | IDB | 1999-00 |
| Bangladesh | Meter Reading & Other Operational Activities of Sales & Distribution Division 1,2,3 under BPDB, Khulna | BPDB | GOB | 1999-2000 |
| Bangladesh | Ghutail Revetment Test Structure under FAP 21 - Bank Protection Project | WARPO | KfW, Germany | 1999-2000 |
| Bangladesh | Environmental Monitoring of EIA for Reju-1, Offshore Exploration Drilling Well in Block 17 | Okland Oil Company | Okland Oil Company | 1999-00 |
| Bangladesh | Gorai River Restoration Project | BWDB | DGIS | 1999-2000 |
| Bangladesh | Preparation of IEE, EIA and EMP for Proposed Madunaghat Surface Water Treatment Plant of CWASA | CWASA | GOB | 1999 |
| Bangladesh | BETS - Victoria Program | Victoria University, Australia | Victoria University, Australia | 1999-04 |
| Bangladesh | Digital Data Network of Bangladesh Telegraph & Telephone Board (BTTB) | BTTB | GOB | 1999 |
| Bangladesh | Implementation of Environmental and Social Management Plan for Gas Supply to Western Zone (Elenga to Baghabari) Project | GTCL | GTCL | 1999 |
| Bangladesh | IEE & EIA of Jalalabad Well Cluster Pad (Well# 5) | Occidental | Occidental | 1998-99 |
| Bangladesh | Preparation of O&M Manual of Teesta Barrage and its Canal Head Regulator | BWDB | GOB | 1998-1999 |
| Bangladesh | Training Program for the River Survey Project FAP-24 | WARPO | EEC | 1998-1999 |
| Bangladesh | Preparation of Land use Plan for the Railway Land at Chittagong | Bangladesh Railway | GOB | 1998-1999 |
| Bangladesh | Review the Cost and Design of the Water and Sanitation Facilities of School Sanitation Program | UNICEF | UNICEF | 1998-1999 |
| Bangladesh | Evaluation of 350 Mini Tara Hand Pumps | DPHE | UNICEF | 1998-1999 |
| Bangladesh | Monitoring the activities UNICEF assisted Water Supply and Sanitation Project | DPHE | UNICEF | 1998-1999 |
| Bangladesh | Computer Based Khatian & Map Printing System Modernisation Project (Pilot-2) | DLRS | GOB | 1998-99 |
| Bangladesh | Installation of NMIC Software at 55 district offices of the DAE & Related Training | (NMIDP), DAE | EEC | 1998 |
| Bangladesh | Database Management System Software for National Minor Irrigation Census (NMIC) | NMIDP | CEC | 1998 |
| Bangladesh | Preparation of Plan, designs, estimates, supervision and soil testing of civil works at different places of coastal area division | DOF | IDA & ADB | 1998-2000 |
| Bangladesh | Tarail - Pachuria Flood Control, Drainage and Irrigation Project, Phase-I | BWDB | GOB | 1998 |
| Bangladesh | Feasibility Study, Detail Design and Construction Supervision of Water Supply and Sanitation Project at Gopalgonj, Tungipara and three other Thanas (Gopalgonj Pourashava and Thana Water Supply & Sanitation Project) | Department of Public Health Engineering (DPHE) | GOB | 1998-2004 |
| Bangladesh | Master Plan for Inland Water Ways Study | BIWTA | DGIS | 1998-1989 |
| Bangladesh | Assessment and Verification of 1998 Flood Damages of BIWTA and BIWTC | Ministry of Shipping BIWTA, BIWTC | IDA | 1998 |
| Bangladesh | Ecological Survey Project | Ministry of Env. & Forest | GOB | 1998-99 |
| Bangladesh | Environmental Safety and Social Impact Assessment (ESSA) for Gas Supply to Western Zone Project | GTCL | WB | 1998 |
| Bangladesh | Hillside Improvement Programme ¿ Reconnaissance Survey for Jalalabad Gas Field at Drill Pads, Access Roads, Gas Treatment Plant Site | Occidental | Occidental | 1998 |
| Bangladesh | Post EIA for Halda Drilling Operations | Cairn Energy PLC | Cairn Energy PLC | 1998 |
| Bangladesh | Environmental Impact Assessment for 2D/3D Seismic Survey | Occidental | Occidental | 1998 |
| Bangladesh | IEE and EIA of Haripur Barge Mounted Power Station | Mott MacDonald (UK) | Mott MacDonald | 1998 |
| Bangladesh | Coastal and Wetland Biodiversity Management Project | DOE | GEF | 1998 |
| Bangladesh | The Socio-Economic Survey for the Coastal and Wetland Biodiversity Management (CWBM) Project | DOE | GEF | 1998 |
| Bangladesh | National Water Management Plan | WARPO | WB | 1998-2001 |
| Bangladesh | Evaluation of the Performance of 50 Tara Pump Converted from Conventional Deep Set Pump | DPHE | UNICEF | 1997 |
| Bangladesh | Consultancy Services for Development of an Environment and Safety Management System in Petrobangla | Petrobangla | Government of Bangladesh | 1997-00 |
| Bangladesh | Preparation of Point Elevation Digital Coverage Maps for Cyclone Shelter Preparatory Study | Mott MacDonald | Mott MacDonald | 1997 |
| Bangladesh | Repair/renovation of Clinic building and construction of MO/FWV quarter at 18 MCWCs | Directorate of Family Planning, GoB | UNFPA | 1997-1999 |
| Bangladesh | Preliminary Environmental Impact Assessment for Gulshan Banani Lake Development | DCC | GOB | 1997 |
| Bangladesh | Initial Environmental Examination (IEE) of North Dhaka Sewerage | DWASA | JICA | 1997 |
| Bangladesh | Environmental Impact Assessment (EIA) for North Dhaka Sewerage | JICA/NJS | JICA | 1997 |
| Bangladesh | Netrakona Integrated Agricultural Production and Water Management Project (Component : On-farm research) | DAE | IFAD | 1997-1999 |
| Bangladesh | Design and Coordination Consultancy for Implementation of the Third Inland Water Transport Project | Ministry of Shipping | IDA | 1997-1999 |
| Bangladesh | Management and Operational Support (Twinning) Program | DWASA | WB | 1997-2000 |
| Bangladesh | Effluent Treatment Plant of Bangladesh Tobacco Company Ltd., Dhaka Factory | Bangladesh Tobacco Company Ltd. (BTC) | GOB | 1997-1998 |
| Bangladesh | Strategy Study to Mobilize Finance and Increase Efficiency in Dhaka Water Supply and Sewerage Sector | DWASA | WB | 1997-1999 |
| Bangladesh | Improved Sanitation Services Project | DWASA | WB | 1997-1999 |
| Bangladesh | Fourth Natural Gas Development Project | Petrobangla | ADB | 1997-1998 |
| Bangladesh | Effluent Treatment Plant of Bangladesh Tobacco Co. Ltd. Dhaka Factory | BTC | BTC | 1997-98 |
| Bangladesh | Style Aspire, An Apartment Complex | Style Apartment Ltd. | Style Apartment Ltd. | 1997-2000 |
| Bangladesh | Pre-feasibility Study of Patiya-Chandanaish- Satkania-Lohagara Integrated Flood Control, Irrigation and Rural Development Project | Begum Gulchemonara Welfare Trust | Begum Gulchemonara Welfare Trust | 1997 |
| Bangladesh | Review of Inland Water Transport Sector | Royal Danish Embassy | DANIDA | 1996 |
| Bangladesh | Assessment of Repair/Renovation of 8 Maternal and Child Welfare Centres (MCWC) | Directorate of Family Planning | UNFPA | 1996 |
| Bangladesh | Study of Narayanganj - Narsinghdi Flood Protection and Irrigation Project | JICA | OECF | 1996-1997 |
| Bangladesh | Isolation of Zone-IV & V and Macro-metering to Determine Available Water in each Zone | DWASA | WB | 1996-1997 |
| Bangladesh | Conducting an Consultancy Services for Independent Check on the Survey Tara Hand pumps | DPHE | UNICEF | 1996-1997 |
| Bangladesh | Supervision of Construction of Dholaikhal Pump Station (Credit TA VI, 2393 BD) | DCC | WB | 1996-1997 |
| Bangladesh | Feasibility Study and Preliminary Design of City View Apartment cum Shopping Centre | Style Apartment Ltd. | City View Apartment Ltd. | 1996-1997 |
| Bangladesh | Consultancy Services for Detailed Design & Construction Supervision of Water Supply Project for Rajshahi Metropolitan City | DPHE | GoB | 1996-2000 |
| Bangladesh | Feasibility Study of Baral Basin Development Project | BWDB | GOB | 1996-1997 |
| Bangladesh | Computer Based Digital Mapping and Khatian Printing System (Pilot-1) and Hardware Maintenance Project | DLRS | GOB | 1995-2002 |
| Bangladesh | Safety and Efficiency Improvement in Bangladesh Gas Sector | Petrobangla | ADB | 1995-1996 |
| Bangladesh | Khulna - Jessore Drainage Rehabilitation Project (Beneficiary Participation) | BWDB | ADB | 1995-1998 |
| Bangladesh | Bahadurabad Revetment Test Structure under FAP 21 - Bank Protection Project | WARPO | KfW, Germany & AFD, France | 1995-1997 |
| Bangladesh | O&M Strengthening of the Second Bhola Irrigation Project | BWDB | ADB | 1995-1997 |
| Bangladesh | Initial Environmental Examination (IEE) of Fertilizers and Agro-chemicals Project | Bangladesh Fertilizers & Agrochemicals Ltd. | Private Financed | 1995 |
| Bangladesh | Planning, Detail Design, Cost Estimating & Construction Supervision of BETS Centre | BETS | BETS | 1995-1999 |
| Bangladesh | Computer Based Khatian & Map Printing System Modernisation Project (Pilot-1) | DLRS | GOB | 1995-01 |
| Bangladesh | Khulna - Jessore Drainage Rehabilitation Project (Component : Agricultural Development) | BWDB | ADB | 1995-1998 |
| Bangladesh | Kalni Kushiyara Pilot Dredging Project under North-East Regional Water Management Project (FAP-6) | WARPO | CIDA | 1994-1999 |
| Bangladesh | Survey of In-plant Training-a Component of National Vocational Training System Reform (UNDP/ILO Project BGD93/010) | Bureau of Manpower Employment & Training | UNDP/ILO | 1994 |
| Bangladesh | Second Small Scale Flood Control Drainage and Irrigation (SSFCDI) Project | BWDB | CIDA, IDA | 1994-1996 |
| Bangladesh | Feasibility Study of Water Supply, Sanitation and Drainage Project for Rajshahi Metropolitan City | DPHE | GoB | 1994 |
| Bangladesh | Immediate Action Program (Training) to Reduce Unaccounted for Water | DWASA | WB | 1994-1997 |
| Bangladesh | Socio Environmental Assessment of Meghna Dhonagoda Irrigation Project | ADB | ADB | 1994 |
| Bangladesh | River Survey Project FAP 24: Management Un | WARPO | EEC | 1993-1996 |
| Bangladesh | Detailed Survey and Investigation for Improvement of the Residential Water Supply System of CAAB, Dhaka | CAAB | GOB | 1993 |
| Bangladesh | Feasibility Study of the Second Bhola Irrigation Project | BWDB | ADB | 1991 |
| Bangladesh | North Central Regional Study (FAP 3) | Flood Plan Co-ordination Organization | CIDA | 1991-1992 |
| Bangladesh | Compartmentalization Pilot Project (CPP/FAP 20)-Phase I | WARPO & BWDB | DGIS, Netherlands; KFW, Germany | 1991-1996 |
| Bangladesh | Bank Protection and River Training/AFPM Pilot Project (FAP 21/22) | WARPO | KfW, CCCE | 1991-1999 |
| Bangladesh | North-East Regional Water Management Project (FAP-6) | Water Resources Planning Organization (WARPO) | CIDA | 1991-2000 |
| Bangladesh | Operation & Maintenance Plan for EIP Programme | BWDB | DGIS | 1990 |
| Bangladesh | Implementation of Revised Water Rate Act Study, 1990 | BWDB | DGIS | 1990-1991 |
| Bangladesh | Meghna River Bank Protection Short Term Study (FAP - 9B) | BWDB | WB | 1990-1992 |
| Bangladesh | BWDB Systems Rehabilitation Project | BWDB | DGIS | 1990-1998 |
| Bangladesh | Mathematical Model Study of Pashur-Sibsa River System and Karnaphuli River Entrance | CPA & MPA | DANIDA | 1990-1992 |
| Bangladesh | Reassessment of BIWTA Marine Workshop | BIWTA | NORAD | 1990 |
| Bangladesh | Pre-feasibility Study for Flood Control in Bangladesh | BWDB | EEC, French | 1989 |
| Bangladesh | Haor Development Project | BWDB | CIDA | 1989 |
| Bangladesh | 18 District Town Water Supply & Sanitation Project | DPHE | DGIS, Netherlands | 1989-1999 |
| Bangladesh | The Maddhapara Hard Rock Mining Project | Bangladesh Oil, Gas and Mineral Development Corporation | OECF | 1989 |
| Bangladesh | Small Scale Irrigation Sector Project (SSISP) | BWDB | EEC | 1988-1990 |
| Bangladesh | Pre-feasibility Study of Second Small Scale Flood Control Drainage and Irrigation Project | BWDB | CIDA, IDA | 1988-1993 |
| Bangladesh | Evaluation of Drainage and Flood Control-II Project | BWDB | WB | 1988-1999 |
| Bangladesh | Performance Improvement Water Supply & Sanitation Project, Khulna | DPHE | DGIS | 1988 |
| Bangladesh | Leak Detection and Waste Prevention Program | DWASA | WB | 1988-1991 |
| Bangladesh | Study and Design of a Small Bore Sewer Pilot Project at Mymensingh | DPHE | WB | 1988-1989 |
| Bangladesh | Fourth Evaluation of EIPs Project | BWDB | DGIS, SIDA | 1988 |
| Bangladesh | Flood Damage Restoration Project | BWDB | WB | 1987-1993 |
| Bangladesh | Small Catchment Rainfall Runoff Study | LGED | ODA (UK) | 1986-1987 |
| Bangladesh | Detailed Design of Standby Water Supply System of Zia International Airport | CAAB | GOB | 1986-1987 |
| Bangladesh | 12 District Towns Water Supply and Sanitation Project | DPHE | DGIS | 1985-1991 |
| Bangladesh | The Second District Towns Water Supply Project | DPHE | ADB | 1985-1987 |
| Bangladesh | Preparation of Master Plan, Detail Design & Construction Supervision of Telephone & Telegraph Exchange Building | T & T Board | GOB | 1984-1989 |
| Bangladesh | Detail Design and Construction Supervision of Biman Poultry Complex, Phase-I&II | Biman Bangladesh | GOB | 1978-1979 |
| Bangladesh | Design and Site Supervision Services for the Fael Khair School-cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR (Site Supervision Services in respect of Supervision of Construction Contract Package - 17) Contract No.: BD1-0048 | IMC Worldwide Ltd. | IDB | 2018-2020 |
| Bangladesh | Architectural Design and Social Impact Assessment Service for the Project titled "Feasibility Study for Modernization of Port Facilities for Khulna, Narshingdi, Barduna and Development of Galachipa, Mongla, Meghna, Sunamganj, Tekerghat, Ghorashal, Kanchpur port, Mojuchowdhuryghat, Daudkandi-Bausia River Port" | BIWTA | World Bank | 2018-2019 |
| Bangladesh | Design and Site Supervision Services for the Fael Khair School-cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR (Survey & Design and Supervision of Scouts Training Centre Cum Cyclone Shelter and Survey & Design of 2 Replacement Shelters | IMC Worldwide Ltd. | IDB | 2017-2020 |
| Bangladesh | Technical Advisory to carry out Site Study and Basis of Design for the proposed Onshore LNG Import and Regasification Terminal at Moheshkhali, Bangladesh (Phase-I) (Sub-Consultancy) | Power Cell | IFC | 2017 |
| Bangladesh | The Logistic Condition Survey at Land Ports for The Data Collection Survey on Matarbari Port Development in Bangladesh | JICA Project Team | JICA | 2017 |
| Bangladesh | Inland Waterway Dredging Feasibility Study Bangladesh Trade and Transport Facilitation Studies RETF Project (BIWTA Component) | BIWTA | World Bank | 2016 |
| Bangladesh | Detailed Techno Feasibility Study and Conceptual Master Planning at Payra Port (Einvironmental and Social Assessment) | Payra Port Authority | British Fund | 2015 |
| Bangladesh | Feasibility Study for Capacity Building Project for Sustainable Development of WaterRelated Infrastructure Part-3 | JICA | JICA | 2012 |
| Canadian Petroleum Training Institute (CPTI) | GTCL Professional Executive Training Program | Canadian Petroleum Training Institute (CPTI) | CPTI | 2011 |
| | | | | |